Factory-direct wholesale · Low trial MOQs · Ontario delivery · 30/70 terms(548) 639-2069sales@thamesvalleysnow.ca
Thames ValleyDistribution Quote0

Buyer guide ·

LED lighting retrofits: a guide for property managers and building owners

Plan an LED lighting retrofit: what to replace first, colour temperature, lumens vs watts, certification, controls and how to estimate payback.

Lighting is one of the simplest energy upgrades in a building: fixtures are easy to swap, savings start immediately, and maintenance drops because LEDs last far longer.

Where to start

Begin with fixtures that run longest: parking garages, corridors, stairwells, exterior and lobby lighting. Lights on 24/7 pay back fastest.

Lumens, not watts

Compare light output (lumens) and efficacy (lumens per watt) rather than wattage. Match or slightly exceed the existing light levels; over-lighting wastes energy.

Colour temperature

  • 2700 K to 3000 K: warm, for suites, lobbies and hospitality.
  • 4000 K: neutral, for corridors, offices and common areas.
  • 5000 K: cool, for garages, warehouses and exterior security lighting.

Keep colour temperature consistent within a space.

Certification

Fixtures installed in Canada need certification from an accredited body (cUL, cETL, CSA and similar marks). Utility incentive programs may also require specific qualified-product listings: check before you buy.

Controls

Occupancy sensors in stairwells and garages, and photocells or timers outdoors, add savings on top of the LED swap.

Estimating payback

Annual savings = (old watts minus new watts) × hours per year × your electricity rate. Add avoided maintenance. Divide installed cost by annual savings for simple payback.

Browse Electrical, Solar & Lighting or send a fixture schedule for a retrofit quote.

Related products

Get wholesale pricing

Tell us what you need. We reply with a written quote, usually within one business day.

More buyer guides

Get wholesale pricing on your list

Send item codes and quantities, or describe what you need. We reply with a written quote, specifications and lead time, usually within one business day.